Top News

|  Maersk ME1 service calls Pipavav port  |    |  Railways implementing projects worth over INR 40,000 crore in Northeast  |    |  2nd cargo flight from Afghanistan to arrive Delhi tomorrow  |    |  India-Iceland direct air connectivity likely by 2018  |    |  Iron ore export slumps with fall in global prices  |    |  Ethiopian signs up for 2 more B777Fs at Paris  |    |  Qatar airport first half cargo increases 19% to 980,000 tonnes  |    |  AirAsia to start flights to South East Asia from next year  |    |  Myanmar & India to increase Border Trade  |    |  GoAir to start third daily service on Bengaluru-Delhi sector from June 24  |    |  India needs INR 2-3 lakh crore investment for new airports  |    |  Shanghai May volumes increase 14.6% to 3.54 million TEU  |    |  India and Afghanistan open air cargo link over Pakistan  |    |  South Central Railway will run 26 special trains  |    |  Indian shipping minister opens box terminal opens at Ennore  |    |  Ocean Network Express will be sixth largest container carrier  |    |  Mumbai airport unlikely to be part of next bidding under UDAN  |    |  GMR group plans to bid for airport projects in Serbia, Jamaica  |    |  Mahindra Aerospace will soon launch 10-seater aircraft  |    |  High speed train corridor to ensure non-stop Net connectivity  |   
You are here: Home » National News » Infrastructure» Cabinet nod for 4 laning of INR 2,776-cr road project

Cabinet nod for 4 laning of INR 2,776-cr road project

08 June 2017 | New Delhi
 

transreproter

The government today approved four-laning of a road stretch to be developed at an estimated cost of INR 2,776-crore in Himachal Pradesh.

The decision on the same was taken at the Cabinet Committee on Economic Affairs (CCEA) meeting, chaired by Prime Minister Narendra Modi.

The Ministry of Road Transport and Highways said in a statement, the CCEA has given its "approval for development of 4 laning from 'end of Pandoh Bypass to Takoli' section of National Highway (NH)-21 in Himachal Pradesh.” It said that

The project will help in expediting the improvement of infrastructure in Himachal Pradesh and in reducing the time and cost of travel for traffic, particularly heavy traffic, plying from 'end of Pandoh Bypass to Takoli' section.

It said that "The cost is estimated to be INR 2,775.93 crore, including cost of land acquisition, resettlement and rehabilitation and other pre-construction activities. The total length of the road to be developed is approximately 19 kilometer (km).”

It said that "This work will be done under the National Highways Development Project (NHDP) Phase IV B on Hybrid Annuity Mode.”

The development of this stretch will also help in uplifting the socio-economic condition of this region in the state. It would also increase employment potential for local labourers for project activities. It has been estimated that a total number of 4,076 mandays are required for construction of 1 kilometer of highway.

   
Transreproter Logo