Top News

|  Punj Lloyd wins orders worth INR 348 cr from Adani, MbPT  |    |  China to run 1,000 freight trains to Europe in 2017  |    |  India’s first dedicated heliport to open in Delhi  |    |  India to link Kathmandu to Delhi and Kolkata by rail  |    |  South Carolina box volume rises 28% in January to 185,018 TEU  |    |  1st cargo ship from India arrives in Bangladesh  |    |  CSP January throughput rises 7% to 8.38 m TEU  |    |  Korea Shipping to buy 10 HMM box ships as part of USD 633.7m prop up  |    |  Asia-Europe rate falls 6% to USD 858 TEU, off 3.7% to Med ports  |    |  Delhi-bound Kalindi Express collides with cargo train at Tundla  |    |  NITI Aayog reviews high speed rail project  |    |  Vistara extends INR 899 sale offer  |    |  Container volume at Hamina-Kotka port rises 13.5% in January  |    |  Railways freight customers may get fixed rate contracts  |    |  Bahri signs contract to provide Logistics services to SAR  |    |  HAL bags IAI orders  |    |  Chardham highway project will be completed by 2018  |    |  Reliance shipyard in Pipavav to repair US Navy vessels  |    |  Air India Express starts Delhi-Dhaka flight  |    |  Singapore Airlines to start fourth flight from Ahmedabad  |   
You are here: Home » National News » Infrastructure» Larsen & Toubro builds iron ore berth at Paradip Port

Larsen & Toubro builds iron ore berth at Paradip Port

01 February 2017 | Paradip
 

transreproter

Larsen & Toubro (L&T) has won orders worth INR 1,286 crore across various segments and, among them, one prestigious order is to build an iron ore at Paradip, Odisha.

The scope of work includes 30m deep sheet pile driving, wagon tippler construction using coffer dam technology and ground improvement for stacker reclaimer.

Of INR1,286 worth of orders, Heavy Civil Infrastructure Business (HCIB) has won an order worth INR 1,071 crore which pertains tounderground metro space and has been secured from MetroLink Express for Gandhinagar and Ahmedabad (MEGA) Company Limited for the design and construction of underground stations and associated tunnels for Package 2 in East-West corridor of the Ahmedabad metro project.

It said the engineering, procurement and construction contract comprises two underground stations at Gheekanta, Shahpur with associated bored tunnels from Kalupur to Shahpur (3.3 km) and Ramp for Package 2.

S.N. Subrahmanyan, Deputy Managing Director and President, L&T said that “This is a significant win in the infrastructure space and we hope that this is a sign for many such projects involving vital infrastructure that are in the offing.”

He added that “This mandate is truly representative of our expertise in building metro systems as we are already building some major metro projects in India and abroad. We are confident of delivering as per the requirements of our clients.”

An order has also been won for the construction of a technology-driven intake well structure using diaphragm wall technology at Purushotapatnam, Andhra Pradesh.

Under the Building & Factories Business, the company has received an order worth INR 215 crore from a renowned client for the construction of a paint manufacturing facility at Vizag, Andhra Pradesh.

   
Transreproter Logo